From the task type screen, select Import to Kepion.
Enter a unique task name here. Task names must be unique to a project.
Select the source connection from the drop down list. Predefined connections will be listed here. Select the schema from the schema drop down list. The available schemas from selected source connection will be populated and listed here. Select the Change to File option (file icon) to use a flat file as a source. The file definition must be defined first.
Select the target connection from the drop down list. Predefined connections will be listed here. Select the schema from the schema drop down list. The available schemas from selected target connection will be populated and listed here. Select the Change to File option (file icon) to use a flat file as a source. The file definition must be defined first.
Select Dimension Hierarchy Load Type from the drop down.
The available load type options are:
Select the Kepion dimension you are loading into, from the Dimension Name drop down.
Select the Kepion dimension attribute column you are mapping into.
This option is only if you wish to import the attribute value into the Kepion dimension.
Select the Source dimension to load from, from the Source Table drop down. Alternatively, select Change to use an SQL Query as the Source to use a SQL query as the Source.
Map the Source Table columns to be imported into the Kepion dimension.
Tip:
If you are importing Dimension Attribute, you need to specify the Source columns to import to in the Mapping Dimension in Kepion.
Toggle to show or hide the advance settings. Advanced settings are different for each task type.
Select Subject Areas for the task if applicable. Refer to Using a Subject Area for more information.
You can choose to select task logging.
Select a logging level. Logging options vary depending on the task type selected.
The available logging options for a Data Migration task type are:
Tip:
If you have both job logging and task logging on- when job logging is set to Standard then the task logging option will override this. Otherwise job logging will always take precedence.
When you have entered all the necessary task details, click Save.
An information box will appear to confirm that the task has been successfully saved. Click Close.
Tip:
New tasks are added to the bottom of the list as Enabled.